48.3 Scaffold Design Header

t:
f:
e:

48.3 Scaffold Design
Castle Court
41 London Road, Reigate
Surrey RH2 9RJ

01737 735599
01737 735001
design@483scaffolddesign.com

Scaffold Design Calculations

Scaffold design calculations are clear, precise and accurate. They are completed in accordance with current British and European Codes of Practice including BS EN 12811-1 (often using the guidance in NASC TG20:08 when completing scaffold designs using tube & fittings), BS 5975:2008 and Eurocode 1. The design calculations are cross-referenced to the design drawings and design risk assessment so that they can be easily followed and interpreted.

Where appropriate structural analysis software is used to assess the scaffold under applied load cases; this is either a 2D or 3D frame with characterised members, nodes and supports. Analysis software is never used in isolation – always as part of a wider calculation package.


A selection of the most common codes of practice we use to complete our designs are:

BS 1139* Metal scaffolding

BS 2482 Timber scaffold boards

BS 5950-1:1990* Structural Steelwork

BS 5973: 1993* Access and working scaffolds and special scaffold structures in steel

BS 5974:1990 Temporarily installed suspended scaffolds and access equipment

BS 5975: 2008 Code of practice for temporary works procedures and the permissible stress design of falsework.

BS 6399: Pt 2: 1997* Code of practice for wind loads

BS 6399: Pt 3: 1988* Loading for buildings - imposed roof loads (snow loading)

BS 8118 Part 1: 1991* Structural Use of Aluminium - Code of Practice for Design

BS EN 12810-1:2003 Façade scaffolds made of prefabricated components - products specifications

BS EN 12811-1:2003 Temporary works equipment: Scaffolds - Performance requirements and general design

BS EN 13374:2004 Temporary Edge Protection Systems - Product Specification, test methods

BS EN 1991 Part 1-4:2005 Eurocode 1: Actions on structures - General Actions - Wind Actions

BS EN 1991-2:2003 Eurocode 1: Actions on structures - Part 2: Traffic loads on bridges

BS EN 39: 2001 Loose steel tubes for tube and coupler scaffolds - Technical delivery conditions

* Codes of practice have been withdrawn, however still used for reference. 

We have left the full Eurocode series off this list for ease (and space!)


A selection of the industry guides we use to complete our scaffold designs are:

HSG 33: 1999 Health & Safety in Roof Work

SG28:09 Safe System of Work for Scaffolding associated with Timber Frame Building Construction

SG4:10 The use of Fall Arrest Equipment Whilst Erecting, Altering & Dismantling Scaffolding

TG4:11 Anchoring systems for scaffolding

TG20:08 NASC Technical Guidance on the use of BS EN 12811-1

TGN(E) 190: 2004 Design and use of temporary scaffold guards


All Design Documents

All the design documents produced by 48.3 Scaffold Design are customer branded and customer owned. Electronic documents are digitally encrypted for client security and password protected if required.

Scaffold design documents are typically supplied in controlled .pdf format to a client specified distribution list under 48.3 document control procedures. All colour prints are sent first class to a nominated person for internal distribution.